What we have built speaks better than what we could promise.
Twenty-four projects delivered by TJL, from high-rise multi-residential to hospitality. Get in touch for details on a specific site.

B4 & B5
Two buildings run in parallel: metal framing, partitions and drywall finishing across nearly a thousand units.

45 Nord
Exterior envelope and acoustic insulation between units on a large residential complex.

Alpin
A mountain project with irregular volumes: metal framing fitted to the roof profiles and an envelope sealed before closing.

Cibèle
Drywall, fire-rated partitions and insulation on a multi-level building, with touch-ups closed before handover.

Caléo
A low-rise complex spread over several building blocks: framing, air barrier and cladding coordinated from one block to the next.

Liz
A constrained urban site: sequenced deliveries and partitions raised floor by floor without blocking the other trades.

Élogia II
Second phase of an already-occupied complex: drywall and insulation carried out while keeping access to the neighbouring buildings.

Urbania Haus
Staggered façade volumes: metal framing and junction details handled one by one to hold airtightness.

Cornélius
Level 5 taping in the common areas, with enhanced acoustic insulation between units.

LUM 2
A compact tower: framing and partitions repeated floor after floor, with the pace held to the last slab.

Marquise 4 et 5
Two twin towers delivered back to back: same wall details, same sequence, two schedules to hold.

Duke
A downtown tower: high-rise assembly, hoist-fed supply and certified fire-rated partitions.

Portes de Londres B1 à B4
Four buildings in one complex: standardised wall details to hold finish quality across all four.

Staybridge Suites
Extended-stay hotel: acoustic partitions between rooms and finishing compliant with the brand standards.

Galliléo G2 & G3
Two low-rise buildings: masonry and cladding envelope, with continuous insulation behind the finish.

Astoria
A multi-level complex: metal framing, exterior walls and insulation delivered building by building.

Espace EN 2/4/6
Three buildings in successive phases: each block's sequence served as the template for the next.

Holiday Inn Express
Repetitive guest rooms and common areas: partitions, ceilings and bulkheads executed on a tight floor cycle.

Symposium
A six-storey building: drywall, thermal and acoustic insulation, delivered with no open deficiency list.

District Concorde
Commercial podium and residential floors: two partition types and two levels of requirement in one building.

Noria Bât. 1 et 2
Two buildings around a courtyard: continuous exterior walls and air barrier, junctions verified before cladding.

Urbano phase 1
First phase of a growing project: framing and drywall installed while keeping the site open for later phases.

Le Néo
A small footprint in a built-up area: partitions and finishing carried out with site access limited to a single façade.

1230 District Union
Two volumes joined by a shared base: acoustic insulation between units and an envelope closed before winter.

